Skip to main content

tmatic.lv

01 10
PROJECTS
for project in portfolio:
  if project.status == "done":
    render(project)
[05/07]
Volkswagen Audi Porsche Mercedes-Benz Tesla Škoda Bentley Schneider Electric thyssenkrupp Allgaier Automotive
P-01 Germany · Wolfsburg

VW Vehicle Transport System Upgrade

Long-term project in cooperation with DURID GmbH. Complete control system upgrade of 128 transport wagons - service life extension of existing machinery. New prefabricated electric cabinets, sensors, communication and navigation systems installed. Step-by-step commissioning following a checklist. Production test and support within 2 km of vehicle montage route covering VW Touran and VW Tiguan body variants. Full documentation per end-customer requirements.

Overhead vehicle transport system at the Wolfsburg plant
Video coming soon
P-02 Germany · Uhingen

MB Fuel Tank Production Line - Allgaier Automotive

Complete PLC software solution for OEM MB fuel tank production including virtual commissioning. Software built remotely in Riga, virtual commissioning at Staufen Engineering in Göppingen. Complex scenario-based process system developed. On-site commissioning with MIG-MAG welding, custom TUCKER stud welding over PLC, manual assembly step visualisation. Helium chamber high-pressure automated inspection. Videojet product marking over TCP/IP. PROFIsafe validation. Worker trainings included.

Fuel tank production line at Allgaier Automotive in Uhingen
Video coming soon
P-03 Latvia · Valmiera

Automotive Connector Quality Validation Line - Mira Motion

Production line check-up and secondary commissioning after transportation. PLC software and hardware diagnosis, HMI upgrade with expanded operation screens. Troubleshooting and peripheral hardware maintenance. Automated full visual and electrical validation - HI/LO voltage and short-circuit tests with camera inspection. EOL tester machine start-up, fine-tuning and repair. Expert reports and quality management support for end customer. Calibration and quality audit preparations.

Connector validation line at Mira Motion in Valmiera
P-04 Germany · Neckarsulm

Audi A6 C8 Montage Line PLC - Start-Up Neckarsulm

Full-cycle development of 8 PLC programs based on VW-Audi software design guidelines. Software built in Riga, remote virtual commissioning and end-client validation. On-site start-up at Audi factory in Neckarsulm. Eight PLCs control door hinge montage for FL and FR doors - precision within 0.1 mm using SEW-EURODRIVE drives and encoders. PROFIsafe equipment validation, checklist tests, production start-up. Line operator trainings and end-client compliance certification.

Photo coming soon
Video coming soon
P-05 Slovakia · Bratislava

Porsche Cayenne Gen.2 Body Platform - Bratislava

Complete project: 3 body geo construction lines, 2 element-securing lines with automated inspection cell, 1 inspection and rework line. 15 PLCs total. Up to 1 year full-line start-up and 1 year Coupe integration during production. 38kW drive commissioning, body fixture robots, statistical data upload to server. Two proprietary Know-How solutions for cycle-time savings and type control. Bilingual HMI and PLC engineering with language toggle. First full start-to-end PLC project by TECHNOMATIC SIA.

Photo coming soon
Video coming soon
From concept to success

We use a structured approach that ensures clarity, efficiency and the best possible outcome for every project.

S1
Analysis
Understanding your goals, requirements and technical environment.
S2
Engineering
Designing reliable and efficient solutions tailored to your needs.
S3
Implementation
Building, testing and integrating systems with minimal impact on production.
S4
Support
Long-term support and continuous improvement of your systems.